How to eat the frog in 4 steps
- The evening before, look at your list and pick one frog: the important task you are most likely to put off.
- Make it concrete: "write the first two pages of the proposal", not "proposal".
- Start it before email, chat and news the next morning.
- Do not switch until it is done or you hit a planned stopping point.
How to choose the frog
The frog is important, not just unpleasant. A dreaded but pointless task is not a frog; drop it. The best frogs usually live in quadrant 2 of the Eisenhower matrix: important, not urgent, and easy to postpone forever. Asana's guide suggests choosing it the night before (Asana).
| Frog | Not a frog |
|---|---|
| Hard conversation with a client | Answering easy emails |
| Starting the tax return | Reorganizing your files |
| Writing the first draft | Formatting the template |
When eating the frog does not fit
- A real emergency arrives: quadrant 1 always wins.
- Your work is reactive by design (support desk, front desk): eat the frog in the first quiet block instead.
- You need a warm-up: one tiny task first is fine, as long as the frog comes second.
Cronos, by Gambit Studio, shows your tasks in four quadrants by urgency and importance on iPhone and iPad, which makes the frog easy to spot: it is the important task you keep leaving in quadrant 2.