Guide · Cronos

Eisenhower matrix order: which quadrant first

Quick answer

The Eisenhower matrix order is: quadrant 1 (urgent and important) first, done now; quadrant 2 (important, not urgent) next, scheduled at a fixed time; quadrant 3 (urgent, not important) delegated or batched; quadrant 4 (neither) dropped. The key is that quadrant 2 comes before quadrant 3, even though quadrant 3 feels more urgent.

Updated 2 min readGambit Studio

Use without installing →Free in your browser, no sign-up

The order, quadrant by quadrant

OrderQuadrantLabelAction
1stUrgent + importantDoNow, yourself
2ndImportant, not urgentScheduleA fixed time on the calendar
3rdUrgent, not importantDelegateHand off, batch or keep short
4thNeitherDeleteDrop it

Why 2 before 3

Eisenhower's line was “I have two kinds of problems, the urgent and the important. The urgent are not important, and the important are never urgent.” (address of August 19, 1954). Urgency is loud; importance is quiet. If quadrant 3 always beats quadrant 2, important work only gets done once it becomes an emergency in quadrant 1.

Ordering tasks inside a quadrant

  • Quadrant 1: earliest deadline first; if equal, the one with the biggest consequence.
  • Quadrant 2: the one that prevents the most future fires.
  • Quadrant 3: batch by type (all emails, all calls).
UrgentNot urgent
Important1. Do it now
Deadlines today, crises, problems that get worse if you wait
2. Schedule it
Planning, learning, health, relationships, long-term projects
Not important3. Delegate or shrink it
Interruptions, many messages and meetings, other people's priorities
4. Drop it
Mindless scrolling, busywork, tasks nobody would miss

Cronos, by Gambit Studio, is built around this: you drop each task into one of the four quadrants of a priority matrix by urgency and importance, on iPhone or iPad, so the important work stays in front and what can be delegated or dropped is in plain sight. More in how to prioritize when everything is urgent.

Sources

  1. The American Presidency Project: Eisenhower's address in Evanston, Illinois, August 19, 1954

Free in your browser

Use it free now, nothing to install

The core of the app works right in your phone or computer browser.

Frequently asked questions

What people ask most about this, answered with the source.

What order do you do the Eisenhower matrix in?
Quadrant 1 first (do), then quadrant 2 (schedule), then quadrant 3 (delegate), and quadrant 4 is dropped.
What are the four labels of the Eisenhower matrix?
Do, Schedule (or Decide), Delegate and Delete (or Eliminate).
Should I do quadrant 3 before quadrant 2?
No. Give quadrant 2 a fixed time first and fit quadrant 3 around it, batched or delegated.
CronosPriority control Eisenhower
Use without installingGet